Integra Central implemented in 5 factories

A French customer asked us to migrate and centralise 5 of their factories with Integra Central on a very tight time schedule. This included the additional challenge of integration with various process control systems on the different production sites, which are dispersed over a wide geographical area. This project-based masterpiece was successfully carried out by our French Integra team within the set time schedule.

 

 

A French customer asked us to migrate and centralise 5 of their factories with Integra Central on a very tight time schedule. This included the additional challenge of integration with various process control systems on the different production sites, which are dispersed over a wide geographical area. This project-based masterpiece was successfully carried out by our French Integra team within the set time schedule